GDPR Compliance

We use cookies to ensure you get the best experience on our website. By continuing to use our site, you accept our use of cookies, privacy policy and terms of service.

Inspector Studio
Florida Wind Mitigation · Rev. 04/26

Florida WindMitigation, builtfor the field.

Complete the OIR-B1-1802 in a writer designed around the form’s actual sections, decisions, calculations, photo evidence, and final output.

9 form sections + summary ASCE 7-22 lookup Photos organized by section
Florida Wind Mitigation1428 Pine Ridge Drive · Clearwater, FL 33755
DRAFTLast Savedjust nowGalleryPreviewMark Complete
1. Building Code 2. Region 3. Roof Slope 4. Coverings 5. Deck 6. Roof-to-Wall 7. Geometry 8. SWR 9. Openings Summary
6. Roof-to-WallRTW Reference
Section 6 — Roof-to-Wall Connection
A. ToenailsTruss or rafter anchored to the top plate.
Minimum conditions to qualify for B, C, or DAll verified connections meet one of the listed conditions. Minimum condition 3 is selected.3
B. ClipsPurpose-made connector ≥386 lb
C. Single WrapsStrap wraps over the truss or rafter
D. Double WrapsTwo straps or a qualifying single strap
Roof-to-wall connectionAttic · North elevationFastener detailAttic · East elevation
BackContinue

Illustrative interface using sample property data. Structure, labels, actions, and visual styling reflect the current Inspector Studio Wind Mitigation writer.

Purpose-built writer

The form is the workflow.

No generic report tree and no imitation form built from reusable template blocks. The writer moves through the OIR-B1-1802 in the same order the final report expects.

01
Building CodePermit year and date context
02
RegionASCE design wind speed
03
Roof SlopePrimary roof slope
04
CoveringsMaterials, approvals, permits
05
DeckAttachment classification
06
Roof-to-WallConnection and minimum condition
07
GeometryHip and flat-roof measurements
08
SWRSecondary water resistance
09
OpeningsGlazed and non-glazed protection
10
SummaryProperty, inspector, signature
1. Building Code2. Region3. Roof Slope4. Coverings5. Deck6. Roof-to-Wall7. Geometry8. SWR9. OpeningsSummary
4. CoveringsPermits
Roof Covering TypesSelect every covering present on the property.
Asphalt / Fiberglass ShinglesSelected
Copy these details to another covering
Concrete / Clay TileSelect
MetalSelect

Representative covering details shown for demonstration. The illustrated controls follow the real Section 4 writer.

Section 2 · Region

One lookup. Region selected. Evidence attached.

Run the ASCE lookup from inside the Region section. Inspector Studio uses the property coordinates to retrieve the ASCE 7-22 design wind speed, selects the matching region, and places the generated evidence sheet into the section’s photos.

Property-specificUses the inspection property’s saved coordinates. ASCE 7-22700-year MRI, Risk Category II. Evidence stays with the sectionThe generated sheet is attached to Region photos.
1. Building Code2. Region3. Roof Slope4. Coverings5. Deck6. Roof-to-Wall
2. Region
Section 2 — RegionLocation based on design wind speed.
Auto-Lookup Wind SpeedASCE 7-22 · 700-year MRI · Risk Category IILookup
DESIGN WIND SPEED146 mphSELECTED REGIONRegion 1 · ≥140 mph
Region 1 — ≥ 140 mphSelected from the returned design wind speed.
ASCE 7-22 Wind Speed DataRegion photos · Evidence sheetAttached

Illustrative lookup result using sample data. The ASCE lookup control and evidence behavior reflect the real writer.

6. Roof-to-WallRTW Reference
Section 6 — Roof-to-Wall Connection
C. Single WrapsPurpose-made connector with substantiated uplift capacity.
Roof-to-Wall PhotosReference image and field photos stay in this section.

Representative connector card based on the real searchable RTW Reference drawer. Catalog values should always be verified against the cited source and observed installation.

Section 6 · Roof-to-Wall

The connector reference opens beside the question.

Search the roof-to-wall catalog by manufacturer or model, compare the field condition with the reference, and use the connector to populate the applicable form selection. The reference image can be attached to the same section for documentation.

Search by brand or modelFind the connector without leaving the writer. Apply the classificationPopulate the connection and qualifying condition, then verify it. Keep the reference accountableAttach the reference image or flag catalog data for review.
Section 4 · Coverings

Bring the permit into the covering.

Open the property’s Permit Hunt results from the covering section. Choose the roof permit, select which coverings it applies to, and Inspector Studio fills the product approval number, permit date, and install year while attaching the permit record to the report.

Explore Permit Hunt
ASPHALT / FIBERGLASS SHINGLES
Permit details applied to this covering

Illustrative permit data. The drawer, roof highlighting, covering mapping, field population, and report attachment reflect the real integration.

Guidance while you work

The writer turns entered facts into visible answers.

Inspector judgment stays in control. Calculated ratings, measurement suggestions, and completion cues surface beside the fields that produce them.

SECTION 7Roof Measurement Suggestion
Hip RoofApply Suggestion

Perimeter 242 ft · Non-Hip 18 ft · 7%

SECTION 4Overall Covering Rating
AAuto-calculatedRe-checked as covering data changes
SECTION 9Opening Protection

Calculated rating A

EVERY SECTIONPhotos beside the answer
6 attached

Upload, reuse, caption, edit, rotate, and reorder section evidence.

Summit Home Inspectionssummithomeinspections.com · (727) 555-0148
Wind Mitigation Inspection ReportUniform Mitigation Verification · OIR-B1-1802
PREPARED FORJordan MitchellPROPERTY1428 Pine Ridge DriveClearwater, FL 33755 · Pinellas County
INSPECTION DATE08/04/2026INSPECTORAlex MorganLICENSE #HI-12874YEAR BUILT2006
Inspection Results Summary
Section 1Building CodeB
Section 2RegionRegion 1
Section 3Roof Slope< 6:12
Section 4Roof CoveringA
Section 5Roof Deck AttachmentB
Section 6Roof-to-WallB · Clips
Section 7Roof GeometryA · Hip Roof
Section 8Secondary Water ResistanceSealed (SWR)
Section 9Opening ProtectionA
Generated by Inspector Studio · August 4, 2026

Illustrative cover using sample company, customer, property, and inspection data. Layout, information hierarchy, and Quick View behavior reflect the current specialty-report output.

Wind Mitigation cover page

Nine sections. One immediate read.

The Wind Mitigation Quick View places the result from every OIR-B1-1802 section on the cover. Building code through opening protection can be reviewed together without hunting through the finished form.

Your company leadsUse your logo, company details, and contact information on the cover. Property photo and detailsPair the inspection address with the customer, date, inspector, license, and year built. Configured by your companyThe cover page, cover photo, and Quick View can be enabled for the report types that support them.
UNIFORM MITIGATION VERIFICATION INSPECTION FORMOIR-B1-1802 (Rev. 04/26)1
PROPERTY INFORMATION
Inspection Address1428 Pine Ridge Drive, Clearwater, FL
Year Built2006
1. BUILDING CODE
BFBC 2007 and later
2. REGION
Region 1 — Design wind speed ≥ 140 mph
6. ROOF-TO-WALL CONNECTION
BClips · Minimum condition 3
Inspector certification and signature
PreviewReview the generated formMark CompleteFinish in the writerPublishRelease from the inspection

Illustrative excerpt—not a reproduction of the complete form. Final output follows the supported report revision and entered inspection data.

Dedicated output

Finish the writer. Deliver the form.

Preview the generated Wind Mitigation report, complete any required signature and inspector-certification steps, mark the work complete, and publish the deliverable from the inspection record.

Preview before completionReview the current generated output at any point. Signature-awareCustomer signature prompts appear when the report requires one. Dedicated Wind Mit outputThe finished document stays attached to the inspection.
FLORIDA WIND MITIGATION

Put a purpose-built Wind Mit writer in the field.

The complete Wind Mitigation experience is included in every Inspector Studio plan.

Get Early Access
Works hand in hand with